
Is the grid the real bottleneck in the energy transition?
Wind and solar farms are being built faster than the power lines to carry what they produce. Institutions disagree about whether the grid is the real limit, or a symptom of slow planning and poor market rules.
Grouped by the country the institution sits in, because where it sits shapes what it concludes. Every title links to the institution's own page; nothing is reproduced here.
United States
Resources for the Future
- Power Delayed: Economic Effects of Electricity Transmission and Generation Development Delays
- Time for a Market Upgrade? A Review of Wholesale Electricity Market Designs for the Future
- Comments on PJM’s proposed changes to its Open Access Transmission Tariff
- The Fate of Coal: Determining Missouri’s Path to a Clean Grid
Germany
Nigeria
Indonesia
Economic Research Institute for ASEAN and East Asia
- Promoting Cyber Security for Distributed Energy Systems (DES) and Smart Grids in ASEAN
- Layered Market Approach to ASEAN Power Grid Development | Economic Research Institute for ASEAN and East Asia (ERIA)
- Promoting Cyber Security for Distributed Energy Systems (DES) and Smart Grids in ASEAN
- Energy Security and India–ASEAN Regional Grid Connectivity and Power Trading: Impediments and Intervention Required
Canada
China
Philippines
Belgium
Ghana
Norway
Poland
Singapore
United Kingdom
Analysis and comments from contributors
Written for this page by people at research institutions and readers, and checked by an editor before it appears. Their views, not ours, and separate from the index above.
Work at a think tank, or follow this closely?
Join free to add your analysis under this question.
