
Is the grid the real bottleneck in the energy transition?
Generation is being built faster than the wires to carry it. Whether transmission is the binding constraint, or a symptom of planning and market design, shapes where the next decade's money should go.
Grouped by the country the institution sits in, because where it sits shapes what it concludes. Every title links to the institution's own page; nothing is reproduced here.
01
United States
Resources for the Future
- Power Delayed: Economic Effects of Electricity Transmission and Generation Development Delays
- Time for a Market Upgrade? A Review of Wholesale Electricity Market Designs for the Future
- Comments on PJM’s proposed changes to its Open Access Transmission Tariff
- The Fate of Coal: Determining Missouri’s Path to a Clean Grid
02
Germany
03
Canada
04
Indonesia
Economic Research Institute for ASEAN and East Asia
- Promoting Cyber Security for Distributed Energy Systems (DES) and Smart Grids in ASEAN
- Promoting Cyber Security for Distributed Energy Systems (DES) and Smart Grids in ASEAN
- Energy Security and India–ASEAN Regional Grid Connectivity and Power Trading: Impediments and Intervention Required
- Energy Security and India–ASEAN Regional Grid Connectivity and Power Trading: Impediments and Intervention Required
05
Unplaced
06
Norway
07
Philippines
08
Poland
09
Singapore
10
